Through years of testing, experience and maintaining the strictest quality control, HRC High Performance Products have helped both designers and contractors modernized the system of reinforcing concrete structures. Their wide range of applications in reinforced concrete have made construction easier, faster and stronger.
To date, HRC has produced millions of t-headed bars and mechanical couplers
in various structures ranging from both private and
federal buildings to complicated, highly-stressed bridges,
offshore platforms and nuclear related facilities.
The San
Francisco-Oakland Bay Bridge carries about 280,000 vehicles a day. It is
being retrofitted to meet life line service standards which means the
bridge should be available for use by emergency response vehicles after
a major earthquake.
The
Richmond-San Rafael Bridge is part of Interstate 580 spanning between the
City of Richmond and the City of San Rafael. It will be seismically
retrofitted to withstand a Maximum Credible Earthquake (MCE) with no
catastrophic loss of life.
New Carquinez
Bridge construction consists of three major contracts: replace existing
westbound bridge mainspan; replace westbound approach, replace Crockett
Interchange and construct environmental mitigation; and build replacement
maintenance facility.
Built in
1967, the San Mateo-Hayward
Bridge carries 77,000 vehicles a day. With
total length of 7.1 miles, it will withstand a Maximum Credible
Earthquake (MCE) with no catastrophic loss of life once seismic retrofits
are implemented.
Located 30
miles north east of San Francisco, the Benicia-Martinez Bridge
will link the City of Benicia in Solano County and the City of Martinez in
Contra Costa County.
T-Heads in Offshore Oil Platforms
GULLFAKS -
NORTH SEA NORTHERN, NORWAY
Depth to top of reservoirs ranges between 2,500 - 3,000 metres below sea level. Gullfaks A will be modified to increase its capacity for gas treatment and re-injection. Two new modules are being installed, one module measuring 39 x 12 x 15 metres for gas treatment and the other measuring 16 x 10 x 12m for pipeline pigging. The total weight to be handled is about 6 500 tons.
EKOFISK II -
NORTH SEA CENTRAL, NORWAY
Ekofisk 2/4 J consists of an 11,400t, eight-leg steel jacket held in place by sixteen piles totaling 5,500t. The jacket supports a 23 500t topside sub-structure with module support frame, process module, separation (transport) module and utility module. It stands in a water depth of 76.1m although it is rated for 90.1m to obviate potential subsidence problems in the chalk reservoir.
TROLL WEST - NORTH SEA NORTHERN, NORWAY
Tallest concrete platform in the world, standing in 305 m of water. Utilizing the skirt piling technique, penetrating 36m into the soft soil.
HEIDRUN TLP FOUNDATIONS, NORWAY
First concrete TLP (Tension Leg Platform) in the world. Made of Light Weight Aggregate (LWA) concrete. Depth of water is 350 m.
HIBERNIA - GRAND BANKS, CANADA
The Hibernia's novel 450,000t gravity base structure design consists of a 105.5m concrete caisson, constructed using high-strength concrete reinforced with steel rods and pre-stressed tendons. The caisson is surrounded by an ice wall, which consists of 16 concrete teeth. Slip-forming, a continuous process of placing rebar and pouring concrete, was utilized during construction of the GBS.
OSEBERG SØR -
NORTH SEA NORTH, NORWAY
The field is located 115 km from shore and 13km from the Oseberg field, in a water depth of 109m supported by a 124m high lattice-type steel jacket substructure.The platform deck has been built as an integrated structure as far as offshore lifting capacity allows.
T-Heads and Couplers in Ports
A BIRD'S EYE VIEW - The Port of Los Angeles (Pier 400) is one of the largest and most diversified seaports in the world. Comprising 7500 acres and 35 miles of waterfront, the Port is America's busiest container port and the leading cruise port on the U.S. West Coast.
Since 1962, the Port of Oakland has spent more than $700 million to construct 680 acres of marine terminals and support area, and to install the equipment needed to handle containerized cargoes. An additional $700 million in maritime projects are now under planning and construction, including new marine terminals, improvements to the inter-modal rail infrastructure, dredging channels and berths from -42' to -50', environmental mitigation, a wildlife habitat, and improved public access.
T-Heads and Couplers in Buildings
San Francisco International Airport is investing $2.4 billion to create a premier airport for a new century, the United States' largest international terminal, new parking garages, a consolidated Rental Car Center, a BART station, and an airport rail system linking everything together.
This state of the art Department of Energy project is designed and being built to vitrify 53 million gallons of hazardous nuclear waste left over from the cold war by blending it with molten glass. The waste treatment plant is a 65-acre complex with three major nuclear facilities, an analytical laboratory, office space, and support buildings.
Turkey Point Nuclear Generating Station Unit 3 & 4 T-Headed Bars used in retrofit application
Turkey Point Nuclear Generating Station comprises two 400-megawatt oil/natural gas-fired generation units (Units 1 and 2) and two Westinghouse pressurized water reactors (Units 3 and 4), each supplying steam to one high pressure and two low-pressure turbines with a power output rated at 693 MWe for each unit. It serves the entire southern portion of Florida.
Covra Nuclear Waste Facility T-Headed Bars used in nuclear facility
The COVRA facility is an above ground storage facility designed to receive high-level radioactive waste from British and French reprocessing of spent fuel from the two Dutch nuclear power reactors. COVRA also receives the low- and intermediate-level waste from each of the four reactors including the waste produced in industries responsible for uranium mining, enrichment, and fuel fabrication for these reactors.