Parcel O

Parcel O

      Parcel O Project: Parcel O Description: Due to project drawing discrepancies some bars did not terminate at the lower elevation needed.  The bars were cut with a torch onsite and the HeadLocks were installed at the correct elevation. Product:...
Transbay Center

Transbay Center

    Transbay Center Project: Transbay Center Description: While using HRC 555 T-heads to replace the hooks one of the bars was installed to high.  The HRC 555 T-head was cut off and the HRC 670 HeadLock was installed at the lower elevation. Product: HRC...
Baptist Medical Center

Baptist Medical Center

      Baptist Medical Center Project: Baptist Medical Center Description: The choice was made to run the bars long on all the drilled shaft cages instead of hooks.  Once the cages were set the bars were cut to the correct elevation and the...

Norfolk Court House

Norfolk Court House Project: Norfolk Court House Description: All the auger cast piles were installed at the start of the project.  At a later time the piles were exposed and the HeadLocks were used on the middle bars for uplift.  Product: HRC 670...

DC Law Enforcement Museum

DC Law Enforcement Museum Project: DC Law Enforcement Museum Description: The standard hooks on the column bars were to high so the hooks were cut off and the HeadLocks were installed to anchor the bars. Product: HRC 670...