by admin | Nov 20, 2017
Back River WWTP Phase 1 & 2 Project: Back River WWTP Phase 1 & 2 Description: HRC 500 Series couplers were used to connect over 9,000 #14 bars in the preassembled walls and columns. HRC 555 T-heads...
by admin | Nov 20, 2017
Lesner Bridge Replacement Project: Lesner Bridge Replacement Description: This project replaced the existing Lesner Bridge with a signature facility that is capable of handling six lanes of traffic in the future. Due to existing bridge and...
by admin | Nov 20, 2017
San Francisco-Oakland Bay Bridge Replacement Project: San Francisco-Oakland Bay Bridge Replacement Description: This 625-meter-long East Span of the San Francisco-Oakland Bay Bridge was the first-ever, single-tower, self-anchored suspension (SAS) bridge. It is...
by admin | Nov 17, 2017
SF Public Utilities Commission HQ Project: SF Public Utilities Commission HQ Description: HRC T-heads and couplers were used to speed up the installation on this 277,000 gfs LEED Platinum building. The SFPUC mandated that the new headquarters be designed to...
by admin | Nov 16, 2017
Gerald Desmond Bridge Project: Gerald Desmond Bridge Replacement Description: The replacement bridge will be a six-lane, cable-stayed design, with a 205-foot clearance to allow the newest generation of cargo ships to enter the...