by admin | Nov 21, 2017
DC Law Enforcement Museum Project: DC Law Enforcement Museum Description: The standard hooks on the column bars were to high so the hooks were cut off and the HeadLocks were installed to anchor the bars. Product: HRC 670...
by admin | Nov 21, 2017
UTC Westfield Project: UTC Westfield Description: The standard hooks were installed to high so the hooks were cut off and the HeadLocks were installed to anchor the bars. In this case there was some tighter clearances above the HeadLocks so a wrench could be...
by admin | Nov 21, 2017
INNOVA Parking Structure Project: INNOVA Parking Structure Description: The columns were installed without any anchorage and the problem was not caught until the beam steel and post tensioning was already installed. With the pour coming the next day the solution...
by admin | Nov 20, 2017
Herndon Station Parking Structure Project: Herndon Station Parking Structure Description: When removing the steel casing on the drilled shaft a rebar stirrup caught onto the casing and pulled the cage up 3 feet too hight. The bars were cut to the correct...
by admin | Nov 20, 2017
Iconic “Basket Bridge” Project: Iconic “Basket Bridge” Description: A 584-foot bridge over the eastbound lanes of the I-210 freeway. With two prominent “basket” columns and a curve-shaped underside of the superstructure, Andrew Leicester’s...